Data center migration
1. The average load-bearing of the machine room is not less than 1000KG/ flat, and the UPS battery should be designed according to the actual equipment.
2, the main entrance room according to the 50 level increase the height of the door, door opening height shall be not less than 2.4 meters, for future equipment import and leave enough space and.
3. All holes in the top of the machine room need to be blocked and waterproof.
4, it is suggested that the two storeys of the machine room should be waterproof.
5, the 2 independent power supply from different transformers is required, which is not less than the available capacity of 200KVA.
6, it is required to be equipped with a standby generator, and the city power can provide a sustainable power supply of less than 24 hours after power outage.
7, all the external facades of the machine room need to be blocked. It's better not to leave a window.
8, suggest the outside of the machine room to do wall waterproof treatment, to prevent water seepage in the rainy season. Because the machine room is located on the first floor, the rainwater leakage prevention measures are done on the outside of the building body.
9, the air conditioning area in the machine room needs to provide 2 ground floor drain in order to solve the problem of drainage in the emergency case of the machine room.
10. A running water pipe is required in the machine room. Supply the precision air conditioning humidifier system. In addition to the water pipe, there should be no other water in the machine room.
11, improve the height. Room under the beam height of not less than 3.5 meters.
12. A reserved hole in the outer wall of the machine room is installed with a new fan and an air vent. The size is about 300*600mm.
13, near the fire passage in the vicinity of the exit of the machine room.